
Define the food before asking for the lowest price
A request for quotation, often shortened to RFQ, is a written description of what you want suppliers to price. For wholesale food, the description needs to identify the actual product. “Milk powder” leaves the fat type and intended use open. “Frozen chicken” leaves the cut and weight open. A precise request makes it easier to distinguish a competitive offer from an offer for a different item.
Use one line for each product and variant, with an attached specification where needed. Record the application, composition, size or grade, net quantity and required packaging. For eggs, include the agreed size range and count. For fries, identify the cut and coating requirement. Tell suppliers which points are mandatory and ask them to list every proposed deviation, including a change of pack or producer.
Keep an approved sample connected to that written description. The sample helps assess defined properties, but a photograph of it cannot establish the condition of a future consignment. Later changes to the specification need an explicit answer before prices are treated as comparable.
Build one comparison sheet for every offer
Use the same headings for each supplier, dated and linked to the quotation reference. Do not hide unanswered questions in a notes file that is separate from the price. Mark them as awaiting confirmation so that the decision maker can see which offers are complete and which still depend on assumptions.
The worksheet below is an original buying aid. It does not rate particular suppliers or describe TradePeak’s current prices. Add fields specific to the food, receiving site and planned use, and keep the same comparison basis throughout.
| Compare | Record for each offer | Reason |
|---|---|---|
| Product | Specification version and stated deviations | Identify substitutions before pricing |
| Quantity | Inner count, net quantity and comparison unit | Compare equivalent amounts |
| Delivered cost | Currency, validity, named place and inclusions | Expose unpriced or duplicated costs |
| Timing and condition | Production/dispatch/delivery dates and remaining life | Assess the usable receiving window |
| Evidence and terms | Sample, documents, payment stages and acceptance | Identify unresolved commitments |
Compare the quantity of food, not the size of the carton
A carton is not a fixed quantity. Record the number of inner packs and the declared net quantity in each. Keep food weight separate from gross shipping weight, which includes packaging. Where drained contents matter, ask for that basis explicitly. Codex CXS 1 distinguishes net contents from drained weight for foods in its defined liquid media; do not assume that one weight describes both the food and its surrounding liquid.
For a hypothetical calculation, offer A contains twelve 500 g packs and costs 60 currency units per carton: 6 kg of declared product, or 10 units/kg. Offer B contains ten 500 g packs and costs 52 units: 5 kg, or 10.40 units/kg. The cheaper carton has the higher price per kilogram. These invented figures illustrate arithmetic, not market prices, pack availability or a TradePeak quotation.
Even after this conversion, compare like with like. Net kilograms do not resolve a difference in composition, egg size, meat cut or cooking performance. If usable yield is relevant, assess it with a defined trial and record the method separately from the declared quantity.
Bring the offers to the same receiving point
Specify the quotation currency, validity date and exact receiving location. Ask what is included in the quoted amount and what remains payable outside it. Depending on the transaction, relevant items may include transport, insurance, handling, customs-related charges or delivery to the receiving site. Confirm which apply and who has priced them; an unknown charge is not zero.
If an Incoterms rule is used, record the rule, its version and the named place precisely. ICC Academy explains that under the C rules, the seller can pay carriage to a destination while risk transfers earlier. Consequently, “freight included” is not enough to tell you who bears the risk during the journey. Have the chosen rule and the actual contracts reviewed for the intended movement.
Avoid counting the same freight twice when building a comparison total. Keep the quoted goods value, each verified additional cost and the assumptions in separate rows. Convert currencies using a stated comparison rate and date, while keeping the original quotation currency visible. This gives a traceable estimate, not a promise that variable charges will remain unchanged.
Compare usable shelf life and acceptance conditions
The total shelf life printed for a product does not tell you how much time will remain when your stock reaches the agreed receiving point. State the minimum remaining period you need at that point and ask how the proposed production date and shipment timing meet it. Define whether an estimate refers to production, dispatch, arrival or delivery after clearance.
For chilled or frozen products, include the required transport and storage conditions and agree the receiving checks. Decide in advance how quantity, damage, date coding and product identity will be recorded, and who will review a disputed lot. A favourable sample result should not erase a mismatch in the delivered item or its documents.
Choose acceptance criteria connected to the actual food. An egg buyer may need a specified count and size band; a bakery may need a controlled mixing trial for an ingredient. Record the method, sample reference and responsible reviewer. Do not use attractive colour, a generic certificate or an unrelated laboratory report as a substitute for the agreed criteria.

Put documents and payment milestones beside the price
A pro forma invoice supports the quotation stage, while a commercial invoice and a packing list serve different purposes in the shipment record. The US International Trade Administration explains these document roles and the need for consistency. Use that distinction when cross-checking the offer, but confirm the actual document requirements with the responsible importer and logistics professionals for the product and destination.
Make a document schedule: what is needed, who issues it, which product or shipment it covers and when it will be available for review. Health, origin or other documents should be requested where applicable, without assuming that an unrelated certificate satisfies the requirement. Resolve conflicting names, quantities or descriptions before dispatch.
Record payment stages, the event that triggers each stage, the currency and the supporting documents agreed by the parties. ICC explains that Incoterms rules do not settle the time, method or currency of payment, or ownership transfer. Those terms need their own agreement. For cross-border payment arrangements, confirm the workable process with the relevant bank and transaction advisers rather than infer it from a delivery acronym.

Make uncertainty visible before selecting a supplier
Separate a confirmed specification, a supplier estimate and a field still awaiting an answer. For example, a production slot may be proposed without a confirmed sailing, or a delivery price may exclude an unpriced destination charge. Show those differences in the comparison instead of assigning an apparently precise all-in total.
Assess technical suitability first, then compare the complete commercial offers. Where several options are suitable, record why the selected one fits the order: a supported specification, workable delivery plan, usable remaining shelf life or a clearer total cost. A scoring table is useful only when its criteria and evidence are visible; a single low number should not conceal a missing essential answer.
Ask for a revised written offer when a material condition changes. Keep the earlier version so the change can be traced. This is particularly useful for repeat orders, where a familiar product name can hide a different carton count, formulation or source.
Send a focused enquiry and confirm the final order
For a TradePeak bulk-food enquiry, send the product and variant, quantity, intended use, required specification, destination and preferred delivery window. Attach the sample reference or technical sheet where available. If something is undecided, name the choice you need help comparing instead of filling the gap with an assumed specification.
Before ordering, check that the selected product, packing count, price basis, delivery conditions, payment milestones and acceptance process match the final written offer. Confirm any permitted alternatives explicitly. The order, commercial invoice and packing list should describe the same agreed transaction.
Use the product pages and the related buying guides to prepare the technical questions. Availability, producer, origin and timing must be confirmed in the offer for the actual order. A clear enquiry gives the sourcing discussion a useful starting point and makes the resulting quotation easier to evaluate.
Put your specification to work
Send the product, quantity, packaging and delivery point so we can review your quotation requirements.
Request a quote ↗


